New Studio Buildout!
|
|
|
![]() meet dave and bill - profoundly hardworking removing a lot of concrete by hand |
|
|
![]() in prep for the new slab |
![]() excavation, phase one - our man jeff does the honors while ben and craig oversee |
|
|
|
|
![]() jeff returns... |
|
![]() mr charles hall contractor extrodinare opening new doors |
![]() way cool principal contractor craig and the full front wall ...and all that old slab rubble is gone |
![]() that's about the size of it |
|
|
|
![]() new roofline/grey skyline the weather has been against us quite a bit |
![]() a long wall, one door |
![]() shiplap goes on portico's what it's called |
|
![]() more 'lap and some trim parking is back to being sane |
|
|
|
|
![]() inner structure appears |
|
![]() rooms taking shape lofty! |
![]() from the future control room into the playing spaces |
![]() stairs |
![]() looking down from the loft through the window opening |
![]() stairs boxed in and a half-wall at the top |
![]() exterior framing is completed rear-corner of new control room. |
![]() control room floor sleepers with accomodations for sub-floor cabling |
![]() floor 'flor tr.v to cover with a floor or flooring |
![]() dog break! l: studio mascot madison, r: her boyfriend loic |
![]() subfloor is done prepping for interior control room framing |
![]() roof! it's good to be watertight |
![]() control room left interior wall machine room where the red ladder is |
![]() control room right wall ladders like to have their picture taken |
![]() control room rear wall soffited ceiling starts to take shape |
![]() more of that blue insulating stuff and the soffit looks framed - that's it for framing! |
![]() "we have so much power now it's not even funny" |
![]() boxes to feed hungry racks of gear |
![]() by the warm glow of the worklights our intrepid engineers toiled |
![]() aaah. warm and fuzzy the insulation goes in |
![]() if you look up from mix position |
![]() sound control yeah, that's what i'm talking about |
![]() if you were sitting playing the atari 7800 on a break from overdubs |
![]() alien attack? justifiably cautious work wear? will the real atom master please stand up |
![]() sheetrocking begins a view of a booth |
![]() the mighty task of sheetrocking the ceiling don't try this at home |
![]() 'rock day one crew: scott, steve, dave, ben, craig, & john |
![]() drywalling day two progress is really visible |
![]() day two crew (not pictured) included craig, ben, caleb, matt & john |
![]() look at that first layer in the main room sound-proofy! |
![]() matt covered in drywall dust |
![]() dynamic drywall duo up on the catwalk |
![]() mud n tape n mud n tape |
![]() a connection is made a lineman's job is pretty serious |
![]() control room perspectives paint, new floor, built-in rack |
![]() as you walk in from the back door more paint and floor look-see |
![]() and on center in the room ah, mahogany, latex and urethane |
![]() okay, so it's messy right now you gotta break a few eggs... |
![]() wirin' and solderin' - who's that guy??? (not pictured, jonathan, jose and (another) mark) |
![]() nice r... no, not gonna say it |
![]() from the producer's desk position the room's taking shape |
![]() fine cabinetry, thank you john, with paint pending did we mention the room's taking shape? |
![]() priming the main rooms begins looks much better than spackle |
![]() view down the hall from the bathroom |
![]() scaffolding, wall lights priming continues |
![]() from the drum room |
![]() from the vox iso |
![]() er... ...engage! |
||