New Studio Buildout!


old shell gets insulated
note the jackhammer...


the guys start removing the old slab
 


meet dave and bill - profoundly hardworking
removing a lot of concrete by hand


more floor gone, front wall begins its exit
 


in prep for the new slab
 

excavation, phase one - our man jeff
does the honors while ben and craig oversee


bigfoot is sighted
 


love that they're called 'sonotubes'
the new control room footprint...


some front wall framing
and the 'tubes have been poured


jeff returns...
 


...for the future marvels
of modern plumbing


mr charles hall contractor extrodinare
opening new doors

way cool principal contractor craig and the full front wall
...and all that old slab rubble is gone

that's about the size of it
 


craig and ben (another critical contractor)
doing a high-wire act


plumbing/hvac man dan
a crucial step in the new space: water/sewer


new roofline/grey skyline
the weather has been against us quite a bit

a long wall, one door
 

shiplap goes on
portico's what it's called


ben and craig and the final roof piece
 


more 'lap and some trim
parking is back to being sane


concrete part II
the new part gets a floor


they left the front wall open
to facilitate the pour


this will mostly be the control room,
machine room, and hallway/bathroom


inner structure appears
 


builder kelly gets the tool belt on
for another day of framing


rooms taking shape
lofty!

from the future control room
into the playing spaces

stairs
 

looking down from the loft
through the window opening

stairs boxed in
and a half-wall at the top

exterior framing is completed
rear-corner of new control room.

control room floor sleepers
with accomodations for sub-floor cabling

floor 'flor tr.v
to cover with a floor or flooring

dog break!
l: studio mascot madison, r: her boyfriend loic

subfloor is done
prepping for interior control room framing

roof!
it's good to be watertight

control room left interior wall
machine room where the red ladder is

control room right wall
ladders like to have their picture taken

control room rear wall
soffited ceiling starts to take shape

more of that blue insulating stuff
and the soffit looks framed - that's it for framing!

"we have so much power now
it's not even funny"

boxes to feed hungry racks of gear
 

by the warm glow of the worklights
our intrepid engineers toiled

aaah. warm and fuzzy
the insulation goes in

if you look up from mix position
 

sound control
yeah, that's what i'm talking about

if you were sitting playing the atari 7800
on a break from overdubs

alien attack? justifiably cautious work wear?
will the real atom master please stand up

sheetrocking begins
a view of a booth

the mighty task of sheetrocking the ceiling
don't try this at home

'rock day one crew:
scott, steve, dave, ben, craig, & john

drywalling day two
progress is really visible

day two crew (not pictured) included
craig, ben, caleb, matt & john

look at that first layer in the main room
sound-proofy!

matt covered in drywall dust
 

dynamic drywall duo
up on the catwalk

mud n tape n mud n tape
 

a connection is made
a lineman's job is pretty serious

control room perspectives
paint, new floor, built-in rack

as you walk in from the back door
more paint and floor look-see

and on center in the room
ah, mahogany, latex and urethane

okay, so it's messy right now
you gotta break a few eggs...

wirin' and solderin' - who's that guy???
(not pictured, jonathan, jose and (another) mark)

nice r...
no, not gonna say it

from the producer's desk position
the room's taking shape

fine cabinetry, thank you john, with paint pending
did we mention the room's taking shape?

priming the main rooms begins
looks much better than spackle

view down the hall
from the bathroom

scaffolding, wall lights
priming continues

from the drum room
 

from the vox iso
 
 

er...
...engage!